{"id":4884,"date":"2020-10-29T15:34:06","date_gmt":"2020-10-29T15:34:06","guid":{"rendered":"https:\/\/coresdevelopment.be\/?p=4884"},"modified":"2022-09-27T16:02:11","modified_gmt":"2022-09-27T16:02:11","slug":"royale-belge-new-step-for-iconic-building","status":"publish","type":"post","link":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/","title":{"rendered":"ROYALE BELGE &#8211; NEW STEP FOR ICONIC BUILDING"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"854\" height=\"293\" src=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cores_royale_belge_vorstlaan_brussel_0-2.jpeg\" alt=\"\" class=\"wp-image-4885\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cores_royale_belge_vorstlaan_brussel_0-2.jpeg 854w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cores_royale_belge_vorstlaan_brussel_0-2-300x103.jpeg 300w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cores_royale_belge_vorstlaan_brussel_0-2-768x263.jpeg 768w\" sizes=\"auto, (max-width: 854px) 100vw, 854px\" \/><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\">ROYALE BELGE PROJECT: APPLICATION FOR PLANNING PERMIT<\/h2>\n\n\n\n<p>An emblematic monument from 1970s in Brussels, &nbsp;the building of the former Royale Belge served as the headquarters of AXA Belgium until 2017, but is completely empty today. A reconversion project is now being rolled out for this magnificent and immense monofunctional building with its bronze-tinted glass and weathering steel frame, surrounded by a green estate spanning some ten hectares. This is a mixed project that will integrate a wide range of functions&nbsp;<strong>with due respect for the architectural heritage.<\/strong><\/p>\n\n\n\n<p>The owner, Souverain 25 (a CORES Development-Urbicoon-Foresite-Ape consortium), will soon apply to the Brussels-Capital Region for planning permit. In addition to the offices, most of which will be retained, the plans include a hotel (with a 300-seat auditorium, meeting rooms, restaurants and bar), co-working spaces, and fitness and wellness facilities.<\/p>\n\n\n\n<p>Depending on the date the permit is issued, work can start in Q2 2021 and be completed in January 2023.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"854\" height=\"480\" src=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.3089.still020-1.jpg\" alt=\"\" class=\"wp-image-4888\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.3089.still020-1.jpg 854w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.3089.still020-1-300x169.jpg 300w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.3089.still020-1-768x432.jpg 768w\" sizes=\"auto, (max-width: 854px) 100vw, 854px\" \/><\/figure><\/div>\n\n\n<h3 class=\"wp-block-heading\">COMMITMENT AND CHALLENGE<\/h3>\n\n\n\n<p>The consortium wants to give the site a new identity as a coherent, living, emblematic and multifunctional whole. The aim is to develop inviting spaces that will enable future users to meet, work and relax.<\/p>\n\n\n\n<p>The client called on a team of architects to develop the concept, namely: the British firm&nbsp;<strong>Caruso St John Architects<\/strong>&nbsp;(London) and the Belgian firm&nbsp;<strong>Bovenbouw Architectuur<\/strong>&nbsp;(Antwerp), plus the firms&nbsp;<strong>DDS+, MA2 (Francis Metzger)<\/strong>&nbsp;and&nbsp;<strong>EOLE (Anne-Marie Sauvat)<\/strong>&nbsp;for the heritage and landscape aspects. Together, they took a critical look at the building in order to identify the best possible potential and enable it to develop, with due account of the rich and varied natural environment also.<\/p>\n\n\n\n<p><em>&nbsp;&#8220;Our challenge will be to reconcile the preservation of the architectural heritage with energetic, economic and ecological imperatives. Our project was conceived as a whole and not as a sum of functions. We wish to revive this emblematic building without taking anything away from its essence&#8221;<\/em>, says&nbsp;<strong>Nicolas Billen, Business Developer, CORES Development.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">PROGRAMMING AND FUTURE USERS<\/h2>\n\n\n\n<p>The project will combine a number of different functions in horizontal layers, with offices, co-working facilities, a hotel (comprising rooms, restaurants and bars, an auditorium and meeting rooms), and a sports and wellness centre. The commercialization of the future spaces is already under way.<\/p>\n\n\n\n<p>An agreement has been signed with Limited Edition Hotels for the management of the hotel rooms. The chain is known for transforming conventional hotel concepts into an innovative and refreshing offer in perfect harmony with the surroundings (Jam Hotel, Le Berger, The White Hotel, &#8230;).&nbsp;&nbsp;<em>&#8220;We are going to operate a 212-room hotel on three levels, as well as the auditorium on the ground floor, a restaurant and a bar. This location is a perfect complement to our offer in Brussels. Our customers will also be able to use the other facilities in the building, including the wellness centre, the co-working spaces and perhaps other services. Finally, we will develop mainly a post-COVID hotel. The health crisis will force people to travel and get together differently. Our concept takes full account of this aspect too,&#8221;<\/em>&nbsp;explains&nbsp;<strong>Jean-Michel Andr\u00e9 of Limited Edition Hotels.<\/strong><\/p>\n\n\n\n<p>The two upper floors of the tower will be occupied by a financial institution.<\/p>\n\n\n\n<p>This means that a user has already been found for 4,000 m\u00b2. &nbsp;Negotiations are at an advanced stage for a total of almost 10,000 m\u00b2.<\/p>\n\n\n<div\n    class=\"flex flex-wrap wp-blocks-block  alignwide\"\n>\n            <a class=\"flex-grow w-1\/3 xl:w-1\/6 h-72 lg:h-120 2xl:h-160\"\n            data-fslightbox href=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.1345.still009-1.jpg\">\n            <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.1345.still009-1.jpg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.1345.still009-1-300x169.jpg 300w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.1345.still009-1-1024x576.jpg 1024w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.1345.still009-1-768x432.jpg 768w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.1345.still009-1-1536x864.jpg 1536w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.1345.still009-1.jpg 1920w\" width=\"1920\" height=\"1080\" loading=\"lazy\" class=\"object-cover object-center !h-full w-full\"\n>\n        <\/a>\n            <a class=\"flex-grow w-1\/3 xl:w-1\/6 h-72 lg:h-120 2xl:h-160\"\n            data-fslightbox href=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/view_1-1.jpeg\">\n            <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/view_1-1.jpeg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/view_1-1-300x180.jpeg 300w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/view_1-1-1024x614.jpeg 1024w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/view_1-1-768x460.jpeg 768w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/view_1-1.jpeg 1280w\" width=\"1280\" height=\"767\" loading=\"lazy\" class=\"object-cover object-center !h-full w-full\"\n>\n        <\/a>\n            <a class=\"flex-grow w-1\/3 xl:w-1\/6 h-72 lg:h-120 2xl:h-160\"\n            data-fslightbox href=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/royale_belge_zwembad_0-1.jpeg\">\n            <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/royale_belge_zwembad_0-1.jpeg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/royale_belge_zwembad_0-1-300x169.jpeg 300w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/royale_belge_zwembad_0-1-1024x576.jpeg 1024w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/royale_belge_zwembad_0-1-768x432.jpeg 768w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/royale_belge_zwembad_0-1.jpeg 1280w\" width=\"1280\" height=\"720\" loading=\"lazy\" class=\"object-cover object-center !h-full w-full\"\n>\n        <\/a>\n            <a class=\"flex-grow w-1\/3 xl:w-1\/6 h-72 lg:h-120 2xl:h-160\"\n            data-fslightbox href=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2701.still017-1.jpg\">\n            <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2701.still017-1.jpg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2701.still017-1-300x169.jpg 300w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2701.still017-1-1024x576.jpg 1024w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2701.still017-1-768x432.jpg 768w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2701.still017-1-1536x864.jpg 1536w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2701.still017-1.jpg 1920w\" width=\"1920\" height=\"1080\" loading=\"lazy\" class=\"object-cover object-center !h-full w-full\"\n>\n        <\/a>\n            <a class=\"flex-grow w-1\/3 xl:w-1\/6 h-72 lg:h-120 2xl:h-160\"\n            data-fslightbox href=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2441.still016-1.jpg\">\n            <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2441.still016-1.jpg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2441.still016-1-300x169.jpg 300w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2441.still016-1-1024x576.jpg 1024w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2441.still016-1-768x432.jpg 768w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2441.still016-1-1536x864.jpg 1536w, https:\/\/coresdevelopment.be\/uploads\/2022\/09\/cam_openingsshot_001_preview_0000.2441.still016-1.jpg 1920w\" width=\"1920\" height=\"1080\" loading=\"lazy\" class=\"object-cover object-center !h-full w-full\"\n>\n        <\/a>\n    <\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>CORES DEVELOPMENT<\/strong><\/p>\n\n\n\n<p>Nicolas Billen<br>GSM: 0476 71 50 38<br>Email: <a href=\"mailto:nicolas@coresdevelopment.be\">nicolas@coresdevelopment.be<\/a><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>FLConsult<\/strong><\/p>\n\n\n\n<p>Florence Legein<br>GSM: 0477 425 926<br>Email: <a href=\"mailto:florence@flconsult.be\">florence@flconsult.be<\/a><\/p>\n\n\n\n<p><\/p>\n<\/div>\n<\/div>\n\n\n<div class=\"border-y my-20 py-4 wp-blocks-block  alignwide\">\n    <div class=\"tracking-widest uppercase text-xs\">\n        <span class=\"text-gray-200\">Uit onze <\/span>\n                    <a href=\"#\" class=\"!no-underline\">\n                <span class=\"text-primary-500 hover:bg-primary-500 hover:text-white\">blog<\/span>\n            <\/a>\n            <\/div>\n\n            <div class=\"grid grid-cols-1 md:grid-cols-2 lg:grid-cols-3 my-16 gap-8\">\n                            <a href=\"https:\/\/coresdevelopment.be\/en\/award-winning-team\/\"\n    class=\"border border-gray-100 hover:border-primary-500 min-h-44 sm:min-h-64 lg:min-h-96 xl:min-h-136 group text-center uppercase\"\n    >\n                    <div>\n                <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2024\/03\/MIPIM-2024-1032-2-150x150.jpg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2024\/03\/MIPIM-2024-1032-2-300x200.jpg 300w, https:\/\/coresdevelopment.be\/uploads\/2024\/03\/MIPIM-2024-1032-2-1024x683.jpg 1024w, https:\/\/coresdevelopment.be\/uploads\/2024\/03\/MIPIM-2024-1032-2-768x512.jpg 768w, https:\/\/coresdevelopment.be\/uploads\/2024\/03\/MIPIM-2024-1032-2-1536x1024.jpg 1536w, https:\/\/coresdevelopment.be\/uploads\/2024\/03\/MIPIM-2024-1032-2-2048x1365.jpg 2048w\" width=\"2560\" height=\"1706\" loading=\"lazy\" class=\"!w-full !h-80 object-cover\"\n>\n            <\/div>\n                <div class=\"p-5 z-20 group-hover:-translate-y-6 bg-white w-full self-end\">\n                            <div>\n                    <div class=\"mb-2 text-2xl font-light tracking-wide !no-underline\">Award Winning Team<\/div>\n                <\/div>\n                                        <div class=\"my-3 text-gray-200 tracking-wide uppercase text-xs\">\n                    15 March 2024\n                <\/div>\n                        <div class=\"text-primary-500 mt-8 !no-underline tracking-widest font-semibold text-sm hover:bg-primary-500 hover:text-white\">\n                <span class=\"invisible group-hover:visible\">&plus; Read more<\/span>\n            <\/div>\n        <\/div>\n    <\/a>\n                            <a href=\"https:\/\/coresdevelopment.be\/en\/new-sustainable-rinkkaai-residential-neighbourhood-by-gent-sint-pieters-station-finally-approved\/\"\n    class=\"border border-gray-100 hover:border-primary-500 min-h-44 sm:min-h-64 lg:min-h-96 xl:min-h-136 group text-center uppercase\"\n    >\n                    <div>\n                <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2024\/02\/Gent-Rinkkaai-Zicht-op-de-Leie-appartementen-te-koop-150x150.jpg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2024\/02\/Gent-Rinkkaai-Zicht-op-de-Leie-appartementen-te-koop-300x192.jpg 300w, https:\/\/coresdevelopment.be\/uploads\/2024\/02\/Gent-Rinkkaai-Zicht-op-de-Leie-appartementen-te-koop.jpg 720w\" width=\"720\" height=\"460\" loading=\"lazy\" class=\"!w-full !h-80 object-cover\"\n>\n            <\/div>\n                <div class=\"p-5 z-20 group-hover:-translate-y-6 bg-white w-full self-end\">\n                            <div>\n                    <div class=\"mb-2 text-2xl font-light tracking-wide !no-underline\">New sustainable Rinkkaai finally approved<\/div>\n                <\/div>\n                                        <div class=\"my-3 text-gray-200 tracking-wide uppercase text-xs\">\n                    08 February 2024\n                <\/div>\n                        <div class=\"text-primary-500 mt-8 !no-underline tracking-widest font-semibold text-sm hover:bg-primary-500 hover:text-white\">\n                <span class=\"invisible group-hover:visible\">&plus; Read more<\/span>\n            <\/div>\n        <\/div>\n    <\/a>\n                            <a href=\"https:\/\/coresdevelopment.be\/en\/royale-belge-nominated-for-mipim-and-res-awards\/\"\n    class=\"border border-gray-100 hover:border-primary-500 min-h-44 sm:min-h-64 lg:min-h-96 xl:min-h-136 group text-center uppercase\"\n    >\n                    <div>\n                <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2024\/01\/Royale-Belge-Brussels-Mipim-Awards-150x150.jpg\" alt=\"\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2024\/01\/Royale-Belge-Brussels-Mipim-Awards-300x192.jpg 300w, https:\/\/coresdevelopment.be\/uploads\/2024\/01\/Royale-Belge-Brussels-Mipim-Awards.jpg 720w\" width=\"720\" height=\"460\" loading=\"lazy\" class=\"!w-full !h-80 object-cover\"\n>\n            <\/div>\n                <div class=\"p-5 z-20 group-hover:-translate-y-6 bg-white w-full self-end\">\n                            <div>\n                    <div class=\"mb-2 text-2xl font-light tracking-wide !no-underline\">Royale Belge Nominated for MIPIM And RES Awards<\/div>\n                <\/div>\n                                        <div class=\"my-3 text-gray-200 tracking-wide uppercase text-xs\">\n                    31 January 2024\n                <\/div>\n                        <div class=\"text-primary-500 mt-8 !no-underline tracking-widest font-semibold text-sm hover:bg-primary-500 hover:text-white\">\n                <span class=\"invisible group-hover:visible\">&plus; Read more<\/span>\n            <\/div>\n        <\/div>\n    <\/a>\n                    <\/div>\n    <\/div>\n\n\n<div class=\"wp-blocks-block  alignwide\">\n        <a href=\"https:\/\/coresdevelopment.be\/en\/magazines\/cores-urban-happiness-magazine-2023-no-04\/\" class=\"flex flex-col-reverse lg:flex-row w-full group hover:shadow-lg !no-underline\">\n            <div class=\"w-full lg:w-2\/5 flex justify-center lg:justify-end p-8 lg:p-16\">\n                                    <img decoding=\"async\"\n    src=\"https:\/\/coresdevelopment.be\/uploads\/2023\/07\/CORES-Urban-Happiness-Magazine-2023-NO.-04_Pagina_01-798x1024.jpg\" alt=\"Lees het CORES Urban Magazine online\" srcset=\"https:\/\/coresdevelopment.be\/uploads\/2023\/07\/CORES-Urban-Happiness-Magazine-2023-NO.-04_Pagina_01-234x300.jpg 234w, https:\/\/coresdevelopment.be\/uploads\/2023\/07\/CORES-Urban-Happiness-Magazine-2023-NO.-04_Pagina_01-798x1024.jpg 798w, https:\/\/coresdevelopment.be\/uploads\/2023\/07\/CORES-Urban-Happiness-Magazine-2023-NO.-04_Pagina_01-768x985.jpg 768w, https:\/\/coresdevelopment.be\/uploads\/2023\/07\/CORES-Urban-Happiness-Magazine-2023-NO.-04_Pagina_01.jpg 906w\" loading=\"lazy\" class=\"!h-60 lg:!h-40 -rotate-12 shadow-lg group-hover:rotate-0 duration-300\"\n>\n                            <\/div>\n            <div class=\"p-10 w-full lg:3\/5 pr-16\">\n                <div class=\"uppercase tracking-widest mb-4\">\n                    <span class=\"text-gray-300 text-xs\">\n                        Cores\n                     <\/span>\n                    <span class=\"text-primary-500 text-xs font-semibold\">\n                        Magazine\n                    <\/span>\n                <\/div>\n                                    <div class=\"text-4xl !text-gray-400 uppercase font-light leading-relaxed\">\n                        CORES URBAN HAPPINESS MAGAZINE 2023 &#8211; NO.04\n                    <\/div>\n                                <div class=\"h-1 bg-primary-500 w-32 mt-4 -left-3 relative\">\n                <\/div>\n                                    <div class=\"text-gray-300 text-sm pt-8 pb-3\">\n                        <p>In this issue:<br \/>\nForeword: Housing as a service \u2013 Mechelen: A historic city in transition \u2013 The comforts of a digital life: From concierge services to shared mobility \u2013 De Tuilerie: Diest\u2019s first gas-free district \u2013 Urban bees: The threatened existence of bees \u2013 Meliflora: Living in nature-friendly Beveren \u2013 Lionel Jadot: Collectable decor for hotel Souverain 25 \u2013 Nobel urban initiative: Catching a bike taxi to the hair salon \u2013 Homo diginaturalis: On the frontier of a natural and digital city \u2013 Harmonious hotspots \u2013 Residential wisdom: The carry-over of registration tax is time-limited \u2013 Shopping: Dark tones, light conscience and more&#8230;<\/p>\n\n                    <\/div>\n                                <div class=\"mt-4\">\n                                            <div class=\"uppercase text-primary-500 hover:text-white hover:bg-primary-500 -ml-4 p-2 transition delay-50 tracking-widest text-sm font-semibold w-max\">\n                            &plus; Discover the magazine\n                        <\/div>\n                                    <\/div>\n            <\/div>\n        <\/a>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>An emblematic monument from 1970s in Brussels, \u00a0the building of the former Royale Belge served as the headquarters of AXA Belgium until 2017, but is completely empty today. A reconversion project is now being rolled out for this magnificent and immense monofunctional building with its bronze-tinted glass and weathering steel frame, surrounded by a green estate spanning some ten hectares. This is a mixed project that will integrate a wide range of functions\u00a0with due respect for the architectural heritage.<\/p>\n","protected":false},"author":1,"featured_media":4964,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[],"post-project":[],"class_list":["post-4884","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>ROYALE BELGE - NEW STEP FOR ICONIC BUILDING - Cores Development<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ROYALE BELGE - NEW STEP FOR ICONIC BUILDING - Cores Development\" \/>\n<meta property=\"og:description\" content=\"An emblematic monument from 1970s in Brussels, \u00a0the building of the former Royale Belge served as the headquarters of AXA Belgium until 2017, but is completely empty today. A reconversion project is now being rolled out for this magnificent and immense monofunctional building with its bronze-tinted glass and weathering steel frame, surrounded by a green estate spanning some ten hectares. This is a mixed project that will integrate a wide range of functions\u00a0with due respect for the architectural heritage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/\" \/>\n<meta property=\"og:site_name\" content=\"Cores Development\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-29T15:34:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-09-27T16:02:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"460\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sjadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"sjadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/\",\"url\":\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/\",\"name\":\"ROYALE BELGE - NEW STEP FOR ICONIC BUILDING - Cores Development\",\"isPartOf\":{\"@id\":\"https:\/\/coresdevelopment.be\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg\",\"datePublished\":\"2020-10-29T15:34:06+00:00\",\"dateModified\":\"2022-09-27T16:02:11+00:00\",\"author\":{\"@id\":\"https:\/\/coresdevelopment.be\/#\/schema\/person\/0db7978079782a34103c101e8bf8681a\"},\"breadcrumb\":{\"@id\":\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#primaryimage\",\"url\":\"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg\",\"contentUrl\":\"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg\",\"width\":720,\"height\":460},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/coresdevelopment.be\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ROYALE BELGE &#8211; NEW STEP FOR ICONIC BUILDING\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/coresdevelopment.be\/#website\",\"url\":\"https:\/\/coresdevelopment.be\/\",\"name\":\"Cores Development\",\"description\":\"En nog een WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/coresdevelopment.be\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/coresdevelopment.be\/#\/schema\/person\/0db7978079782a34103c101e8bf8681a\",\"name\":\"sjadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/coresdevelopment.be\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f5766f541095c4abed6a393c83ea8885?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f5766f541095c4abed6a393c83ea8885?s=96&d=mm&r=g\",\"caption\":\"sjadmin\"},\"sameAs\":[\"https:\/\/coresdevelopment.be\/wordpress\"],\"url\":\"https:\/\/coresdevelopment.be\/en\/author\/sjadmin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ROYALE BELGE - NEW STEP FOR ICONIC BUILDING - Cores Development","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/","og_locale":"en_US","og_type":"article","og_title":"ROYALE BELGE - NEW STEP FOR ICONIC BUILDING - Cores Development","og_description":"An emblematic monument from 1970s in Brussels, \u00a0the building of the former Royale Belge served as the headquarters of AXA Belgium until 2017, but is completely empty today. A reconversion project is now being rolled out for this magnificent and immense monofunctional building with its bronze-tinted glass and weathering steel frame, surrounded by a green estate spanning some ten hectares. This is a mixed project that will integrate a wide range of functions\u00a0with due respect for the architectural heritage.","og_url":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/","og_site_name":"Cores Development","article_published_time":"2020-10-29T15:34:06+00:00","article_modified_time":"2022-09-27T16:02:11+00:00","og_image":[{"width":720,"height":460,"url":"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg","type":"image\/jpeg"}],"author":"sjadmin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"sjadmin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/","url":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/","name":"ROYALE BELGE - NEW STEP FOR ICONIC BUILDING - Cores Development","isPartOf":{"@id":"https:\/\/coresdevelopment.be\/#website"},"primaryImageOfPage":{"@id":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#primaryimage"},"image":{"@id":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#primaryimage"},"thumbnailUrl":"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg","datePublished":"2020-10-29T15:34:06+00:00","dateModified":"2022-09-27T16:02:11+00:00","author":{"@id":"https:\/\/coresdevelopment.be\/#\/schema\/person\/0db7978079782a34103c101e8bf8681a"},"breadcrumb":{"@id":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#primaryimage","url":"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg","contentUrl":"https:\/\/coresdevelopment.be\/uploads\/2020\/10\/cores_royale_belge_vorstlaan_brussel_0.jpeg","width":720,"height":460},{"@type":"BreadcrumbList","@id":"https:\/\/coresdevelopment.be\/en\/royale-belge-new-step-for-iconic-building\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/coresdevelopment.be\/en\/"},{"@type":"ListItem","position":2,"name":"ROYALE BELGE &#8211; NEW STEP FOR ICONIC BUILDING"}]},{"@type":"WebSite","@id":"https:\/\/coresdevelopment.be\/#website","url":"https:\/\/coresdevelopment.be\/","name":"Cores Development","description":"En nog een WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/coresdevelopment.be\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/coresdevelopment.be\/#\/schema\/person\/0db7978079782a34103c101e8bf8681a","name":"sjadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/coresdevelopment.be\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f5766f541095c4abed6a393c83ea8885?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f5766f541095c4abed6a393c83ea8885?s=96&d=mm&r=g","caption":"sjadmin"},"sameAs":["https:\/\/coresdevelopment.be\/wordpress"],"url":"https:\/\/coresdevelopment.be\/en\/author\/sjadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/posts\/4884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/comments?post=4884"}],"version-history":[{"count":2,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/posts\/4884\/revisions"}],"predecessor-version":[{"id":4983,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/posts\/4884\/revisions\/4983"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/media\/4964"}],"wp:attachment":[{"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/media?parent=4884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/categories?post=4884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/tags?post=4884"},{"taxonomy":"post-project","embeddable":true,"href":"https:\/\/coresdevelopment.be\/en\/wp-json\/wp\/v2\/post-project?post=4884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}